At Montech, the assembling team consists of 10 employees, 3 of them are trainees. They assemble approximately 200 different conveyors per month. On average, the installation of a conveyor needs 45min. The longest conveyor belt to date was a TB250 with 18 meters in length and the shortest was 195mm in length.